LIGNA 2025 - 26 - 30 MAI 2025 | HANNOVER | Hall 25 - Stand K46
TERMOWORLD
The co-operation initiated with Omnia inspired Termolegno to develop with this partner a new model of drying kiln equipped with a photo-voltaic system. >>>
The “start and stop” drying process consists in the strategic modulation and reduction of ventilation throughout the treatment to the point of nullifying it when not required, resulting in thermal and electrical savings of up to 50%. >>>
To combine these requirements in view of major productions, Termolegno has developed an innovative patented technology with Windsor Engineering, a New Zealand-based company: the Continuos Drying Technology CDK. >>>
QUALITÉ ET
COMPÉTENCE
AU SERVICE DES
PROFESSIONNELS
DU BOIS


HAUT
TECHNOLOGIE
ET PROCESSUS
INNOVATION

GESTION,
CONTRÔLE
ET SOUTIEN
A DISTANCE
